ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

103

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $411k 52k
MMBtu
$10.83
- Electrical $213k 3,769k
kWh
$0.14
- Natural Gas $83k 13k
MMBtu
$6.20

749

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 6.9k
MMBtu
13.3%
- Electrical $43k 671k
kWh
17.8%
- Natural Gas $5.5k -
MMBtu
-
Waste $0.9k
Productivity/Other $17k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall

88

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $444k 57k
MMBtu
$10.08
- Electrical $230k 4,158k
kWh
$0.14
- Natural Gas $94k 14k
MMBtu
$6.09

280

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.5k
MMBtu
4.4%
- Electrical $15k 247k
kWh
5.9%
- Natural Gas $0.7k -
MMBtu
-
Waste $0.0k
Productivity/Other $1.4k
TOTAL $22k