ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

93

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $438k 56k
MMBtu
$10.06
- Electrical $225k 4,061k
kWh
$0.14
- Natural Gas $91k 14k
MMBtu
$5.95

683

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 7.1k
MMBtu
12.6%
- Electrical $42k 691k
kWh
17.0%
- Natural Gas $5.7k -
MMBtu
-
Waste $0.9k
Productivity/Other $14k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

85

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $448k 58k
MMBtu
$9.92
- Electrical $234k 4,248k
kWh
$0.14
- Natural Gas $96k 14k
MMBtu
$6.04

266

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.4k
MMBtu
4.1%
- Electrical $14k 235k
kWh
5.5%
- Natural Gas $1.6k -
MMBtu
-
Waste $0.0k
Productivity/Other $1.4k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall