ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

107

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $403k 50k
MMBtu
$11.04
- Electrical $207k 3,663k
kWh
$0.13
- Natural Gas $81k 12k
MMBtu
$6.55

776

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 6.8k
MMBtu
13.5%
- Electrical $42k 664k
kWh
18.1%
- Natural Gas $5.5k -
MMBtu
-
Waste $0.8k
Productivity/Other $23k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

91

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $446k 57k
MMBtu
$10.08
- Electrical $231k 4,141k
kWh
$0.14
- Natural Gas $93k 14k
MMBtu
$6.11

287

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.5k
MMBtu
4.4%
- Electrical $15k 245k
kWh
5.9%
- Natural Gas $0.9k -
MMBtu
-
Waste $0.0k
Productivity/Other $5.6k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall