ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

91

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $430k 56k
MMBtu
$10.02
- Electrical $223k 4,045k
kWh
$0.14
- Natural Gas $90k 14k
MMBtu
$5.87

667

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 7.1k
MMBtu
12.8%
- Electrical $42k 694k
kWh
17.2%
- Natural Gas $6.7k -
MMBtu
-
Waste $1.0k
Productivity/Other $13k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $451k 59k
MMBtu
$9.84
- Electrical $236k 4,289k
kWh
$0.14
- Natural Gas $97k 15k
MMBtu
$6.04

258

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.4k
MMBtu
4.0%
- Electrical $13k 231k
kWh
5.4%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.0k
Productivity/Other $1.5k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall