ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Saw blade and handtool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

35

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 64k
MMBtu
$10.81
- Electrical $363k 4,955k
kWh
$0.080
- Natural Gas $108k 12k
MMBtu
$7.00

280

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $96k 5.3k
MMBtu
8.4%
- Electrical $34k 522k
kWh
10.5%
- Natural Gas $14k -
MMBtu
-
Waste $1.2k
Productivity/Other $75k
TOTAL $172k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $559k 64k
MMBtu
$9.34
- Electrical $332k 4,925k
kWh
$0.070
- Natural Gas $115k 13k
MMBtu
$6.77

124

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.6k
MMBtu
4.0%
- Electrical $18k 251k
kWh
5.1%
- Natural Gas $4.3k -
MMBtu
-
Waste $0.4k
Productivity/Other $40k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall