ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cutlery and handtool manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $677k 90k
MMBtu
$9.12
- Electrical $397k 6,368k
kWh
$0.069
- Natural Gas $157k 24k
MMBtu
$7.19

370

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 6.1k
MMBtu
6.7%
- Electrical $38k 594k
kWh
9.3%
- Natural Gas $15k -
MMBtu
-
Waste $1.0k
Productivity/Other $40k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

43

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $668k 89k
MMBtu
$9.16
- Electrical $388k 6,068k
kWh
$0.069
- Natural Gas $166k 26k
MMBtu
$7.22

160

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 3.0k
MMBtu
3.4%
- Electrical $20k 297k
kWh
4.9%
- Natural Gas $4.0k -
MMBtu
-
Waste $0.3k
Productivity/Other $30k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall