ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Metal crown, closure, and other metal stamping (except automotive)
SIC 2+ Digits Required
3+ Characters Required for Products

52

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $643k 99k
MMBtu
$8.76
- Electrical $295k 6,529k
kWh
$0.063
- Natural Gas $191k 32k
MMBtu
$8.03

476

Recommendations

9.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 8.5k
MMBtu
8.5%
- Electrical $37k 827k
kWh
12.7%
- Natural Gas $27k -
MMBtu
-
Waste $3.0k
Productivity/Other $13k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

50

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $662k 103k
MMBtu
$8.67
- Electrical $302k 6,739k
kWh
$0.061
- Natural Gas $197k 33k
MMBtu
$8.00

212

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.3k
MMBtu
3.2%
- Electrical $15k 318k
kWh
4.7%
- Natural Gas $9.0k -
MMBtu
-
Waste $0.8k
Productivity/Other $4.6k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall