ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Iron and steel forging
SIC 2+ Digits Required
3+ Characters Required for Products

49

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,671k 262k
MMBtu
$7.49
- Electrical $701k 10,954k
kWh
$0.54
- Natural Gas $726k 150k
MMBtu
$5.47

416

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $209k 14k
MMBtu
5.3%
- Electrical $82k 1,365k
kWh
12.5%
- Natural Gas $88k -
MMBtu
-
Waste $1.4k
Productivity/Other $39k
TOTAL $249k
*May be negative reflecting an increased cost component required to save energy and costs overall

41

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,653k 250k
MMBtu
$7.58
- Electrical $664k 9,844k
kWh
$0.63
- Natural Gas $766k 149k
MMBtu
$5.68

169

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 7.5k
MMBtu
3.0%
- Electrical $43k 735k
kWh
7.5%
- Natural Gas $23k -
MMBtu
-
Waste $0.3k
Productivity/Other $39k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall