ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Iron and steel forging
SIC 2+ Digits Required
3+ Characters Required for Products

46

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,592k 247k
MMBtu
$7.60
- Electrical $678k 10,196k
kWh
$0.57
- Natural Gas $693k 142k
MMBtu
$5.40

392

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $210k 13k
MMBtu
5.4%
- Electrical $79k 1,293k
kWh
12.7%
- Natural Gas $90k -
MMBtu
-
Waste $1.4k
Productivity/Other $35k
TOTAL $247k
*May be negative reflecting an increased cost component required to save energy and costs overall

40

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,655k 251k
MMBtu
$7.60
- Electrical $677k 10,031k
kWh
$0.64
- Natural Gas $755k 148k
MMBtu
$5.68

167

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 7.7k
MMBtu
3.1%
- Electrical $44k 752k
kWh
7.5%
- Natural Gas $24k -
MMBtu
-
Waste $0.3k
Productivity/Other $40k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall