ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Forging and stamping
SIC 2+ Digits Required
3+ Characters Required for Products

137

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,097k 164k
MMBtu
$8.83
- Electrical $485k 8,410k
kWh
$0.23
- Natural Gas $388k 76k
MMBtu
$7.62

1,210

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $164k 11k
MMBtu
6.9%
- Electrical $72k 1,105k
kWh
13.1%
- Natural Gas $47k -
MMBtu
-
Waste $2.0k
Productivity/Other $37k
TOTAL $204k
*May be negative reflecting an increased cost component required to save energy and costs overall

125

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,091k 168k
MMBtu
$8.55
- Electrical $483k 8,540k
kWh
$0.25
- Natural Gas $396k 78k
MMBtu
$7.54

503

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 5.1k
MMBtu
3.0%
- Electrical $27k 495k
kWh
5.8%
- Natural Gas $12k -
MMBtu
-
Waste ($-0.5)k
Productivity/Other $20k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall