ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Forging and stamping
SIC 2+ Digits Required
3+ Characters Required for Products

128

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,078k 164k
MMBtu
$8.52
- Electrical $480k 8,500k
kWh
$0.24
- Natural Gas $389k 76k
MMBtu
$7.48

1,125

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $145k 11k
MMBtu
6.8%
- Electrical $71k 1,092k
kWh
12.8%
- Natural Gas $45k -
MMBtu
-
Waste $1.9k
Productivity/Other $38k
TOTAL $185k
*May be negative reflecting an increased cost component required to save energy and costs overall

118

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,069k 161k
MMBtu
$8.12
- Electrical $466k 8,216k
kWh
$0.26
- Natural Gas $399k 75k
MMBtu
$7.60

474

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 5.2k
MMBtu
3.2%
- Electrical $27k 509k
kWh
6.2%
- Natural Gas $13k -
MMBtu
-
Waste ($-0.6)k
Productivity/Other $19k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall