ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Nonferrous metal foundries
SIC 2+ Digits Required
3+ Characters Required for Products

123

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,165k 187k
MMBtu
$8.48
- Electrical $510k 10,859k
kWh
$0.20
- Natural Gas $424k 76k
MMBtu
$7.52

1,046

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 9.4k
MMBtu
5.0%
- Electrical $50k 921k
kWh
8.5%
- Natural Gas $80k -
MMBtu
-
Waste $50k
Productivity/Other $49k
TOTAL $246k
*May be negative reflecting an increased cost component required to save energy and costs overall

118

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,136k 186k
MMBtu
$7.96
- Electrical $476k 10,691k
kWh
$0.20
- Natural Gas $425k 76k
MMBtu
$7.25

457

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 3.6k
MMBtu
2.0%
- Electrical $18k 356k
kWh
3.3%
- Natural Gas $27k -
MMBtu
-
Waste $1.7k
Productivity/Other $8.7k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall