ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Nonferrous metal foundries
SIC 2+ Digits Required
3+ Characters Required for Products

120

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,164k 189k
MMBtu
$8.21
- Electrical $500k 10,925k
kWh
$0.20
- Natural Gas $429k 77k
MMBtu
$7.39

1,023

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 9.3k
MMBtu
4.9%
- Electrical $48k 911k
kWh
8.3%
- Natural Gas $82k -
MMBtu
-
Waste $52k
Productivity/Other $51k
TOTAL $248k
*May be negative reflecting an increased cost component required to save energy and costs overall

116

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,144k 186k
MMBtu
$7.95
- Electrical $480k 10,793k
kWh
$0.20
- Natural Gas $426k 75k
MMBtu
$7.23

453

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 3.7k
MMBtu
2.0%
- Electrical $18k 360k
kWh
3.3%
- Natural Gas $28k -
MMBtu
-
Waste $0.8k
Productivity/Other $8.9k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall