ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Steel foundries (except investment)
SIC 2+ Digits Required
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,683k 224k
MMBtu
$8.49
- Electrical $814k 14,151k
kWh
$0.064
- Natural Gas $511k 79k
MMBtu
$7.93

266

Recommendations

8.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $179k 10k
MMBtu
4.7%
- Electrical $61k 1,018k
kWh
7.2%
- Natural Gas $94k -
MMBtu
-
Waste $41k
Productivity/Other $41k
TOTAL $260k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,636k 216k
MMBtu
$8.57
- Electrical $767k 13,819k
kWh
$0.063
- Natural Gas $515k 75k
MMBtu
$8.34

86

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 4.0k
MMBtu
1.8%
- Electrical $22k 390k
kWh
2.8%
- Natural Gas $36k -
MMBtu
-
Waste $1.3k
Productivity/Other $13k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall