ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Iron foundries
SIC 2+ Digits Required
3+ Characters Required for Products

81

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,735k 364k
MMBtu
$8.58
- Electrical $1,385k 26,358k
kWh
$0.24
- Natural Gas $364k 59k
MMBtu
$7.16

638

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $221k 20k
MMBtu
5.5%
- Electrical $117k 1,957k
kWh
7.4%
- Natural Gas $26k -
MMBtu
-
Waste $4.3k
Productivity/Other $63k
TOTAL $288k
*May be negative reflecting an increased cost component required to save energy and costs overall

77

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,796k 373k
MMBtu
$8.34
- Electrical $1,380k 26,839k
kWh
$0.24
- Natural Gas $379k 62k
MMBtu
$7.03

252

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 6.7k
MMBtu
1.8%
- Electrical $33k 649k
kWh
2.4%
- Natural Gas $13k -
MMBtu
-
Waste $0.7k
Productivity/Other $24k
TOTAL $93k
*May be negative reflecting an increased cost component required to save energy and costs overall