ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Iron foundries
SIC 2+ Digits Required
3+ Characters Required for Products

85

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,663k 352k
MMBtu
$8.77
- Electrical $1,359k 25,536k
kWh
$0.23
- Natural Gas $348k 57k
MMBtu
$7.07

661

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $218k 20k
MMBtu
5.6%
- Electrical $118k 1,936k
kWh
7.6%
- Natural Gas $25k -
MMBtu
-
Waste $4.1k
Productivity/Other $59k
TOTAL $282k
*May be negative reflecting an increased cost component required to save energy and costs overall

81

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,735k 363k
MMBtu
$8.67
- Electrical $1,383k 26,322k
kWh
$0.24
- Natural Gas $362k 59k
MMBtu
$7.12

259

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 6.5k
MMBtu
1.8%
- Electrical $32k 630k
kWh
2.4%
- Natural Gas $13k -
MMBtu
-
Waste $0.7k
Productivity/Other $23k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall