ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Iron foundries
SIC 2+ Digits Required
3+ Characters Required for Products

82

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,725k 362k
MMBtu
$8.59
- Electrical $1,390k 26,259k
kWh
$0.24
- Natural Gas $360k 59k
MMBtu
$7.12

643

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $220k 20k
MMBtu
5.5%
- Electrical $117k 1,946k
kWh
7.4%
- Natural Gas $26k -
MMBtu
-
Waste $4.2k
Productivity/Other $62k
TOTAL $286k
*May be negative reflecting an increased cost component required to save energy and costs overall

79

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,795k 372k
MMBtu
$8.51
- Electrical $1,415k 26,933k
kWh
$0.24
- Natural Gas $371k 60k
MMBtu
$7.16

254

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 6.6k
MMBtu
1.8%
- Electrical $33k 642k
kWh
2.4%
- Natural Gas $13k -
MMBtu
-
Waste $0.7k
Productivity/Other $23k
TOTAL $91k
*May be negative reflecting an increased cost component required to save energy and costs overall