ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ferrous metal foundries
SIC 2+ Digits Required
3+ Characters Required for Products

128

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,190k 354k
MMBtu
$8.51
- Electrical $1,097k 20,459k
kWh
$0.18
- Natural Gas $373k 122k
MMBtu
$7.23

1,047

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $190k 16k
MMBtu
4.4%
- Electrical $91k 1,527k
kWh
7.5%
- Natural Gas $43k -
MMBtu
-
Waste $12k
Productivity/Other $64k
TOTAL $267k
*May be negative reflecting an increased cost component required to save energy and costs overall

122

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,239k 364k
MMBtu
$8.31
- Electrical $1,100k 20,845k
kWh
$0.18
- Natural Gas $388k 127k
MMBtu
$7.10

419

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 5.4k
MMBtu
1.5%
- Electrical $28k 528k
kWh
2.5%
- Natural Gas $17k -
MMBtu
-
Waste $0.9k
Productivity/Other $19k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall