ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ferrous metal foundries
SIC 2+ Digits Required
3+ Characters Required for Products

138

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,124k 339k
MMBtu
$8.68
- Electrical $1,074k 19,670k
kWh
$0.17
- Natural Gas $360k 116k
MMBtu
$7.15

1,117

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $187k 15k
MMBtu
4.5%
- Electrical $92k 1,497k
kWh
7.6%
- Natural Gas $41k -
MMBtu
-
Waste $12k
Productivity/Other $64k
TOTAL $262k
*May be negative reflecting an increased cost component required to save energy and costs overall

131

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,184k 351k
MMBtu
$8.62
- Electrical $1,097k 20,305k
kWh
$0.17
- Natural Gas $374k 122k
MMBtu
$7.22

433

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 5.2k
MMBtu
1.5%
- Electrical $27k 509k
kWh
2.5%
- Natural Gas $16k -
MMBtu
-
Waste $0.8k
Productivity/Other $17k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall