ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Foundries
SIC 2+ Digits Required
3+ Characters Required for Products

258

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,677k 269k
MMBtu
$8.46
- Electrical $807k 15,602k
kWh
$0.18
- Natural Gas $392k 98k
MMBtu
$7.26

2,140

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $168k 13k
MMBtu
4.7%
- Electrical $72k 1,225k
kWh
7.8%
- Natural Gas $60k -
MMBtu
-
Waste $30k
Productivity/Other $58k
TOTAL $256k
*May be negative reflecting an increased cost component required to save energy and costs overall

247

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,696k 273k
MMBtu
$8.30
- Electrical $807k 15,838k
kWh
$0.19
- Natural Gas $399k 100k
MMBtu
$7.22

886

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 4.5k
MMBtu
1.6%
- Electrical $23k 439k
kWh
2.8%
- Natural Gas $22k -
MMBtu
-
Waste $0.8k
Productivity/Other $13k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall