ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Foundries
SIC 2+ Digits Required
3+ Characters Required for Products

252

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,687k 271k
MMBtu
$8.31
- Electrical $808k 15,728k
kWh
$0.18
- Natural Gas $393k 98k
MMBtu
$7.16

2,101

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $168k 13k
MMBtu
4.6%
- Electrical $71k 1,222k
kWh
7.8%
- Natural Gas $61k -
MMBtu
-
Waste $30k
Productivity/Other $59k
TOTAL $257k
*May be negative reflecting an increased cost component required to save energy and costs overall

239

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,716k 278k
MMBtu
$8.25
- Electrical $815k 16,093k
kWh
$0.19
- Natural Gas $404k 101k
MMBtu
$7.26

868

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 4.6k
MMBtu
1.6%
- Electrical $23k 446k
kWh
2.8%
- Natural Gas $22k -
MMBtu
-
Waste $0.9k
Productivity/Other $14k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall