ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Nonferrous metal (except aluminum) production and processing
SIC 2+ Digits Required
3+ Characters Required for Products

69

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,466k 200k
MMBtu
$9.15
- Electrical $707k 12,521k
kWh
$0.071
- Natural Gas $505k 70k
MMBtu
$7.92

594

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 11k
MMBtu
5.5%
- Electrical $63k 1,063k
kWh
8.5%
- Natural Gas $49k -
MMBtu
-
Waste $28k
Productivity/Other $75k
TOTAL $245k
*May be negative reflecting an increased cost component required to save energy and costs overall

65

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,514k 206k
MMBtu
$9.09
- Electrical $733k 12,930k
kWh
$0.073
- Natural Gas $524k 72k
MMBtu
$8.04

253

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 3.5k
MMBtu
1.7%
- Electrical $20k 345k
kWh
2.7%
- Natural Gas $23k -
MMBtu
-
Waste $0.4k
Productivity/Other $4.0k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall