The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | Other aluminum rolling, drawing, and extruding | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
58
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,695k | 253k |
MMBtu
|
$7.71 |
- Electrical | $770k | 12,847k |
kWh
|
$0.064 |
- Natural Gas | $701k | 115k |
MMBtu
|
$6.66 |
466
Recommendations
8.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $247k | 17k |
MMBtu
|
6.9% |
- Electrical | $117k | 1,692k |
kWh
|
13.2% |
- Natural Gas | $102k | - |
MMBtu
|
- |
Waste | $6.8k | |||
Productivity/Other | $48k | |||
TOTAL | $302k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
57
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,714k | 257k |
MMBtu
|
$7.39 |
- Electrical | $776k | 13,035k |
kWh
|
$0.062 |
- Natural Gas | $714k | 117k |
MMBtu
|
$6.78 |
180
Implemented Recommendations
3.2
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $70k | 6.3k |
MMBtu
|
2.4% |
- Electrical | $34k | 610k |
kWh
|
4.7% |
- Natural Gas | $29k | - |
MMBtu
|
- |
Waste | $6.7k | |||
Productivity/Other | $6.7k | |||
TOTAL | $84k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |