ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Alumina and aluminum production and processing
SIC 2+ Digits Required
3+ Characters Required for Products

97

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,131k 491k
MMBtu
$7.23
- Electrical $1,135k 21,315k
kWh
$0.060
- Natural Gas $1,629k 267k
MMBtu
$6.69

795

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $246k 17k
MMBtu
3.4%
- Electrical $101k 1,632k
kWh
7.7%
- Natural Gas $113k -
MMBtu
-
Waste $7.2k
Productivity/Other $79k
TOTAL $331k
*May be negative reflecting an increased cost component required to save energy and costs overall

93

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,113k 489k
MMBtu
$7.24
- Electrical $1,103k 21,073k
kWh
$0.060
- Natural Gas $1,645k 268k
MMBtu
$6.75

329

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 6.5k
MMBtu
1.3%
- Electrical $35k 634k
kWh
3.0%
- Natural Gas $36k -
MMBtu
-
Waste $4.3k
Productivity/Other $30k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall