ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Alumina and aluminum production and processing
SIC 2+ Digits Required
3+ Characters Required for Products

99

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,093k 484k
MMBtu
$7.41
- Electrical $1,131k 21,126k
kWh
$0.061
- Natural Gas $1,601k 263k
MMBtu
$6.60

811

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $244k 17k
MMBtu
3.5%
- Electrical $102k 1,637k
kWh
7.7%
- Natural Gas $111k -
MMBtu
-
Waste $7.0k
Productivity/Other $77k
TOTAL $329k
*May be negative reflecting an increased cost component required to save energy and costs overall

94

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,141k 493k
MMBtu
$7.23
- Electrical $1,127k 21,305k
kWh
$0.060
- Natural Gas $1,643k 269k
MMBtu
$6.71

332

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 6.6k
MMBtu
1.3%
- Electrical $36k 640k
kWh
3.0%
- Natural Gas $36k -
MMBtu
-
Waste $4.3k
Productivity/Other $30k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall