ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Alumina and aluminum production and processing
SIC 2+ Digits Required
3+ Characters Required for Products

103

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,076k 486k
MMBtu
$7.50
- Electrical $1,126k 21,063k
kWh
$0.061
- Natural Gas $1,581k 266k
MMBtu
$6.53

837

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $244k 17k
MMBtu
3.6%
- Electrical $105k 1,699k
kWh
8.1%
- Natural Gas $107k -
MMBtu
-
Waste $6.8k
Productivity/Other $80k
TOTAL $331k
*May be negative reflecting an increased cost component required to save energy and costs overall

98

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,090k 484k
MMBtu
$7.24
- Electrical $1,128k 21,209k
kWh
$0.060
- Natural Gas $1,589k 262k
MMBtu
$6.63

339

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $81k 6.4k
MMBtu
1.3%
- Electrical $35k 625k
kWh
2.9%
- Natural Gas $35k -
MMBtu
-
Waste $4.1k
Productivity/Other $28k
TOTAL $113k
*May be negative reflecting an increased cost component required to save energy and costs overall