ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Steel wire drawing
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,365k 280k
MMBtu
$6.59
- Electrical $684k 15,184k
kWh
$0.052
- Natural Gas $434k 124k
MMBtu
$6.26

335

Recommendations

10.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $194k 22k
MMBtu
7.8%
- Electrical $98k 2,126k
kWh
14.0%
- Natural Gas $40k -
MMBtu
-
Waste $27k
Productivity/Other $69k
TOTAL $291k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,365k 280k
MMBtu
$6.59
- Electrical $684k 15,184k
kWh
$0.052
- Natural Gas $434k 124k
MMBtu
$6.26

135

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 4.6k
MMBtu
1.6%
- Electrical $20k 449k
kWh
3.0%
- Natural Gas $25k -
MMBtu
-
Waste $6.2k
Productivity/Other $33k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall