ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Rolled steel shape manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,321k 271k
MMBtu
$8.66
- Electrical $748k 16,882k
kWh
$0.066
- Natural Gas $334k 95k
MMBtu
$15.77

371

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $136k 11k
MMBtu
4.1%
- Electrical $58k 1,077k
kWh
6.4%
- Natural Gas $40k -
MMBtu
-
Waste $0.8k
Productivity/Other $85k
TOTAL $221k
*May be negative reflecting an increased cost component required to save energy and costs overall

40

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,354k 280k
MMBtu
$8.63
- Electrical $770k 17,622k
kWh
$0.063
- Natural Gas $342k 96k
MMBtu
$16.26

153

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 2.5k
MMBtu
0.9%
- Electrical $14k 248k
kWh
1.4%
- Natural Gas $7.3k -
MMBtu
-
Waste $0.5k
Productivity/Other $1.3k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall