ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Rolled steel shape manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,368k 282k
MMBtu
$8.60
- Electrical $770k 17,580k
kWh
$0.064
- Natural Gas $348k 99k
MMBtu
$16.25

360

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $136k 11k
MMBtu
3.9%
- Electrical $55k 1,079k
kWh
6.1%
- Natural Gas $41k -
MMBtu
-
Waste $0.8k
Productivity/Other $89k
TOTAL $225k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,470k 307k
MMBtu
$8.19
- Electrical $831k 19,304k
kWh
$0.060
- Natural Gas $377k 106k
MMBtu
$7.12

146

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 2.6k
MMBtu
0.9%
- Electrical $13k 256k
kWh
1.3%
- Natural Gas $8.1k -
MMBtu
-
Waste $0.5k
Productivity/Other $1.4k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall