ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 33121 Iron and steel pipe and tube manufacturing from purchased steel

45

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,166k 170k
MMBtu
$8.17
- Electrical $598k 11,512k
kWh
$0.063
- Natural Gas $277k 52k
MMBtu
$5.56

351

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $149k 16k
MMBtu
9.5%
- Electrical $88k 1,582k
kWh
13.7%
- Natural Gas $29k -
MMBtu
-
Waste $7.7k
Productivity/Other $78k
TOTAL $235k
*May be negative reflecting an increased cost component required to save energy and costs overall

42

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,184k 174k
MMBtu
$8.10
- Electrical $596k 11,779k
kWh
$0.062
- Natural Gas $280k 53k
MMBtu
$5.65

158

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 7.9k
MMBtu
4.5%
- Electrical $36k 772k
kWh
6.6%
- Natural Gas $11k -
MMBtu
-
Waste $4.5k
Productivity/Other $19k
TOTAL $93k