The ITAC Statistics page displays the average assessment results for the selected criteria.
30
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $4,805k | 981k |
MMBtu
|
$7.83 |
- Electrical | $3,190k | 79,582k |
kWh
|
$0.064 |
- Natural Gas | $1,011k | 165k |
MMBtu
|
$6.55 |
197
Recommendations
6.6
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $84k | 23k |
MMBtu
|
2.3% |
- Electrical | $99k | 2,215k |
kWh
|
2.8% |
- Natural Gas | ($-45.7)k | - |
MMBtu
|
- |
Waste | $1.8k | |||
Productivity/Other | $303k | |||
TOTAL | $389k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
29
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $4,941k | 1,008k |
MMBtu
|
$7.95 |
- Electrical | $3,281k | 81,829k |
kWh
|
$0.064 |
- Natural Gas | $1,036k | 169k |
MMBtu
|
$6.55 |
62
Implemented Recommendations
2.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | ($-157.0)k | 2.7k |
MMBtu
|
0.3% |
- Electrical | $14k | 259k |
kWh
|
0.3% |
- Natural Gas | ($-177.5)k | - |
MMBtu
|
- |
Waste | $0.7k | |||
Productivity/Other | $286k | |||
TOTAL | $130k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |