ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Primary metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

553

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,001k 333k
MMBtu
$8.05
- Electrical $952k 19,585k
kWh
$0.12
- Natural Gas $649k 126k
MMBtu
$6.99

4,657

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $172k 14k
MMBtu
4.3%
- Electrical $77k 1,394k
kWh
7.1%
- Natural Gas $59k -
MMBtu
-
Waste $21k
Productivity/Other $78k
TOTAL $271k
*May be negative reflecting an increased cost component required to save energy and costs overall

526

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,036k 340k
MMBtu
$7.99
- Electrical $962k 20,036k
kWh
$0.12
- Natural Gas $663k 128k
MMBtu
$6.99

1,933

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 4.9k
MMBtu
1.4%
- Electrical $25k 475k
kWh
2.4%
- Natural Gas $12k -
MMBtu
-
Waste $2.0k
Productivity/Other $31k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall