ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Primary metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

581

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,965k 327k
MMBtu
$8.23
- Electrical $939k 19,130k
kWh
$0.12
- Natural Gas $634k 125k
MMBtu
$7.59

4,847

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $171k 14k
MMBtu
4.4%
- Electrical $79k 1,402k
kWh
7.3%
- Natural Gas $56k -
MMBtu
-
Waste $20k
Productivity/Other $81k
TOTAL $273k
*May be negative reflecting an increased cost component required to save energy and costs overall

554

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,003k 334k
MMBtu
$8.10
- Electrical $955k 19,637k
kWh
$0.12
- Natural Gas $647k 126k
MMBtu
$7.68

1,990

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.7k
MMBtu
1.4%
- Electrical $24k 462k
kWh
2.4%
- Natural Gas $12k -
MMBtu
-
Waste $1.9k
Productivity/Other $30k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall