ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Primary metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

564

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,994k 331k
MMBtu
$8.13
- Electrical $955k 19,496k
kWh
$0.12
- Natural Gas $643k 125k
MMBtu
$7.61

4,735

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $172k 14k
MMBtu
4.3%
- Electrical $78k 1,399k
kWh
7.2%
- Natural Gas $58k -
MMBtu
-
Waste $21k
Productivity/Other $78k
TOTAL $270k
*May be negative reflecting an increased cost component required to save energy and costs overall

537

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,032k 338k
MMBtu
$8.04
- Electrical $966k 19,928k
kWh
$0.12
- Natural Gas $658k 127k
MMBtu
$7.01

1,950

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.8k
MMBtu
1.4%
- Electrical $25k 471k
kWh
2.4%
- Natural Gas $12k -
MMBtu
-
Waste $2.0k
Productivity/Other $31k
TOTAL $82k
*May be negative reflecting an increased cost component required to save energy and costs overall