ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Primary metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

593

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,961k 325k
MMBtu
$8.30
- Electrical $942k 19,040k
kWh
$0.12
- Natural Gas $628k 123k
MMBtu
$7.60

4,934

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $170k 14k
MMBtu
4.4%
- Electrical $80k 1,394k
kWh
7.3%
- Natural Gas $55k -
MMBtu
-
Waste $20k
Productivity/Other $80k
TOTAL $270k
*May be negative reflecting an increased cost component required to save energy and costs overall

562

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,987k 331k
MMBtu
$8.13
- Electrical $948k 19,447k
kWh
$0.12
- Natural Gas $640k 125k
MMBtu
$7.66

2,006

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.7k
MMBtu
1.4%
- Electrical $24k 458k
kWh
2.4%
- Natural Gas $12k -
MMBtu
-
Waste $2.1k
Productivity/Other $29k
TOTAL $80k
*May be negative reflecting an increased cost component required to save energy and costs overall