ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cut stone and stone product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $974k 137k
MMBtu
$8.52
- Electrical $589k 10,093k
kWh
$0.055
- Natural Gas $130k 31k
MMBtu
$2.42

54

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 7.2k
MMBtu
5.3%
- Electrical $39k 701k
kWh
6.9%
- Natural Gas $1.0k -
MMBtu
-
Waste $6.1k
Productivity/Other $4.5k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $974k 137k
MMBtu
$8.52
- Electrical $589k 10,093k
kWh
$0.055
- Natural Gas $130k 31k
MMBtu
$2.42

22

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 3.4k
MMBtu
2.5%
- Electrical $20k 329k
kWh
3.3%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other $0.9k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall