ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Abrasive product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $793k 173k
MMBtu
$7.07
- Electrical $449k 14,254k
kWh
$0.048
- Natural Gas $157k 23k
MMBtu
$5.33

117

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 9.3k
MMBtu
5.4%
- Electrical $47k 909k
kWh
6.4%
- Natural Gas $53k -
MMBtu
-
Waste $0.8k
Productivity/Other $57k
TOTAL $166k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $793k 173k
MMBtu
$7.07
- Electrical $449k 14,254k
kWh
$0.048
- Natural Gas $157k 23k
MMBtu
$5.33

57

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.1k
MMBtu
1.8%
- Electrical $15k 307k
kWh
2.2%
- Natural Gas $9.5k -
MMBtu
-
Waste -
Productivity/Other $3.3k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall