ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Gypsum product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,193k 686k
MMBtu
$9.61
- Electrical $912k 13,980k
kWh
$0.078
- Natural Gas $2,993k 542k
MMBtu
$8.21

149

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $503k 54k
MMBtu
7.9%
- Electrical $301k 5,313k
kWh
38.0%
- Natural Gas $125k -
MMBtu
-
Waste -
Productivity/Other $472k
TOTAL $975k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,193k 686k
MMBtu
$9.61
- Electrical $912k 13,980k
kWh
$0.078
- Natural Gas $2,993k 542k
MMBtu
$8.21

58

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 18k
MMBtu
2.6%
- Electrical $91k 1,734k
kWh
12.4%
- Natural Gas ($-61.0)k -
MMBtu
-
Waste -
Productivity/Other $37k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall