ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Lime manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,333k 1,081k
MMBtu
$4.40
- Electrical $868k 22,919k
kWh
$0.040
- Natural Gas $1,343k 326k
MMBtu
$3.85

29

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $278k 24k
MMBtu
2.3%
- Electrical $102k 2,385k
kWh
10.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $2.9k
TOTAL $281k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,333k 1,081k
MMBtu
$4.40
- Electrical $868k 22,919k
kWh
$0.040
- Natural Gas $1,343k 326k
MMBtu
$3.85

18

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.2k
MMBtu
0.3%
- Electrical $13k 309k
kWh
1.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $2.9k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall