The ITAC Statistics page displays the average assessment results for the selected criteria.
31
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $576k | 77k |
MMBtu
|
$9.65 |
- Electrical | $236k | 4,580k |
kWh
|
$0.069 |
- Natural Gas | $190k | 26k |
MMBtu
|
$6.67 |
222
Recommendations
7.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $68k | 5.3k |
MMBtu
|
6.8% |
- Electrical | $32k | 513k |
kWh
|
11.2% |
- Natural Gas | $14k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $14k | |||
TOTAL | $82k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
28
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $608k | 82k |
MMBtu
|
$9.45 |
- Electrical | $252k | 4,934k |
kWh
|
$0.068 |
- Natural Gas | $204k | 27k |
MMBtu
|
$7.08 |
86
Implemented Recommendations
3.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $29k | 1.6k |
MMBtu
|
2.0% |
- Electrical | $10k | 157k |
kWh
|
3.2% |
- Natural Gas | $11k | - |
MMBtu
|
- |
Waste | $0.0k | |||
Productivity/Other | $3.1k | |||
TOTAL | $32k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |