The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | Consider three or four days around-the-clock operation rather than one or two shifts per day | |
NAICS | Concrete pipe manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
11
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $317k | 48k |
MMBtu
|
$6.89 |
- Electrical | $126k | 2,264k |
kWh
|
$0.055 |
- Natural Gas | $116k | 24k |
MMBtu
|
$5.35 |
79
Recommendations
7.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $44k | 4.4k |
MMBtu
|
9.2% |
- Electrical | $26k | 431k |
kWh
|
19.0% |
- Natural Gas | $5.7k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $61k | |||
TOTAL | $105k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
11
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $317k | 48k |
MMBtu
|
$6.89 |
- Electrical | $126k | 2,264k |
kWh
|
$0.055 |
- Natural Gas | $116k | 24k |
MMBtu
|
$5.35 |
34
Implemented Recommendations
3.1
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $21k | 2.5k |
MMBtu
|
5.3% |
- Electrical | $13k | 249k |
kWh
|
11.0% |
- Natural Gas | $2.9k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $38k | |||
TOTAL | $59k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |