The ITAC Statistics page displays the average assessment results for the selected criteria.
| ARC | 2+ Digits Required | |
| NAICS | Concrete block and brick manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
14
Matching Assessments
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $651k | 84k |
MMBtu
|
$11.90 |
| - Electrical | $213k | 2,525k |
kWh
|
$0.077 |
| - Natural Gas | $287k | 57k |
MMBtu
|
$6.26 |
93
Recommendations
6.6
Recommendations Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $55k | 2.7k |
MMBtu
|
3.2% |
| - Electrical | $14k | 260k |
kWh
|
10.3% |
| - Natural Gas | $18k | - |
MMBtu
|
- |
| Waste | $2.5k | |||
| Productivity/Other | $37k | |||
| TOTAL | $94k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||
14
with Implementation Data
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $651k | 84k |
MMBtu
|
$11.90 |
| - Electrical | $213k | 2,525k |
kWh
|
$0.077 |
| - Natural Gas | $287k | 57k |
MMBtu
|
$6.26 |
41
Implemented Recommendations
2.9
Implemented Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $15k | 1.5k |
MMBtu
|
1.7% |
| - Electrical | $9.9k | 142k |
kWh
|
5.6% |
| - Natural Gas | $2.4k | - |
MMBtu
|
- |
| Waste | - | |||
| Productivity/Other | ($-0.3)k | |||
| TOTAL | $15k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||