ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Concrete pipe, brick, and block manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $504k 68k
MMBtu
$9.70
- Electrical $175k 2,410k
kWh
$0.067
- Natural Gas $212k 42k
MMBtu
$5.86

172

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 3.4k
MMBtu
5.0%
- Electrical $19k 335k
kWh
13.9%
- Natural Gas $13k -
MMBtu
-
Waste $1.4k
Productivity/Other $48k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $475k 57k
MMBtu
$9.95
- Electrical $175k 2,375k
kWh
$0.068
- Natural Gas $186k 31k
MMBtu
$5.99

70

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.9k
MMBtu
3.4%
- Electrical $11k 190k
kWh
8.0%
- Natural Gas $2.8k -
MMBtu
-
Waste -
Productivity/Other $17k
TOTAL $35k