ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ready-mix concrete manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $360k 40k
MMBtu
$13.68
- Electrical $97k 1,315k
kWh
$0.094
- Natural Gas $72k 13k
MMBtu
$3.78

171

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 1.2k
MMBtu
2.9%
- Electrical $12k 113k
kWh
8.6%
- Natural Gas $12k -
MMBtu
-
Waste $0.8k
Productivity/Other $24k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $341k 42k
MMBtu
$11.30
- Electrical $96k 1,380k
kWh
$0.090
- Natural Gas $75k 14k
MMBtu
$3.75

74

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 1.0k
MMBtu
2.4%
- Electrical $7.4k 100k
kWh
7.3%
- Natural Gas $8.1k -
MMBtu
-
Waste -
Productivity/Other $17k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall