ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ready-mix concrete manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $354k 39k
MMBtu
$13.96
- Electrical $95k 1,281k
kWh
$0.095
- Natural Gas $72k 12k
MMBtu
$4.05

176

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 1.1k
MMBtu
2.9%
- Electrical $11k 110k
kWh
8.6%
- Natural Gas $11k -
MMBtu
-
Waste $0.8k
Productivity/Other $23k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $366k 41k
MMBtu
$13.22
- Electrical $96k 1,334k
kWh
$0.092
- Natural Gas $75k 13k
MMBtu
$3.91

74

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.0k
MMBtu
2.3%
- Electrical $6.9k 93k
kWh
7.0%
- Natural Gas $7.5k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $34k