ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Ready-mix concrete manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $341k 42k
MMBtu
$11.30
- Electrical $96k 1,380k
kWh
$0.090
- Natural Gas $75k 14k
MMBtu
$3.75

154

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 1.5k
MMBtu
3.5%
- Electrical $11k 144k
kWh
10.5%
- Natural Gas $13k -
MMBtu
-
Waste $0.9k
Productivity/Other $24k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

25

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $325k 41k
MMBtu
$11.27
- Electrical $84k 1,210k
kWh
$0.090
- Natural Gas $77k 14k
MMBtu
$3.46

68

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 0.5k
MMBtu
1.2%
- Electrical $3.6k 46k
kWh
3.8%
- Natural Gas $8.4k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall