ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cement manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $6,781k 1,540k
MMBtu
$9.61
- Electrical $3,937k 81,090k
kWh
$0.087
- Natural Gas $656k 230k
MMBtu
$2.87

101

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $896k 163k
MMBtu
10.6%
- Electrical $699k 15,855k
kWh
19.6%
- Natural Gas ($-11.4)k -
MMBtu
-
Waste $0.2k
Productivity/Other $33k
TOTAL $929k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $6,781k 1,540k
MMBtu
$9.61
- Electrical $3,937k 81,090k
kWh
$0.087
- Natural Gas $656k 230k
MMBtu
$2.87

41

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 7.4k
MMBtu
0.5%
- Electrical $34k 717k
kWh
0.9%
- Natural Gas $1.3k -
MMBtu
-
Waste $0.2k
Productivity/Other $20k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall