ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cement manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,030k 1,603k
MMBtu
$9.31
- Electrical $3,928k 81,357k
kWh
$0.085
- Natural Gas $938k 317k
MMBtu
$2.89

108

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $855k 155k
MMBtu
9.7%
- Electrical $668k 15,148k
kWh
18.6%
- Natural Gas ($-10.7)k -
MMBtu
-
Waste $0.2k
Productivity/Other $32k
TOTAL $888k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,030k 1,603k
MMBtu
$9.31
- Electrical $3,928k 81,357k
kWh
$0.085
- Natural Gas $938k 317k
MMBtu
$2.89

46

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 8.1k
MMBtu
0.5%
- Electrical $37k 786k
kWh
1.0%
- Natural Gas $1.2k -
MMBtu
-
Waste $0.2k
Productivity/Other $20k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall