The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 3273 Cement and concrete product manufacturing

100

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,659k 340k
MMBtu
$10.03
- Electrical $849k 17,025k
kWh
$0.077
- Natural Gas $300k 79k
MMBtu
$5.03

656

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $195k 31k
MMBtu
9.1%
- Electrical $138k 3,007k
kWh
17.7%
- Natural Gas $9.1k -
MMBtu
-
Waste $0.7k
Productivity/Other $29k
TOTAL $225k
*May be negative reflecting an increased cost component required to save energy and costs overall

96

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,706k 350k
MMBtu
$10.05
- Electrical $880k 17,661k
kWh
$0.077
- Natural Gas $302k 79k
MMBtu
$5.12

276

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.7k
MMBtu
0.8%
- Electrical $15k 268k
kWh
1.5%
- Natural Gas $6.3k -
MMBtu
-
Waste $0.0k
Productivity/Other $14k
TOTAL $40k