ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Glass container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,949k 1,437k
MMBtu
$5.46
- Electrical $3,466k 68,673k
kWh
$0.051
- Natural Gas $4,218k 733k
MMBtu
$4.47

45

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $614k 59k
MMBtu
4.1%
- Electrical $264k 5,794k
kWh
8.4%
- Natural Gas $318k -
MMBtu
-
Waste -
Productivity/Other $6.6k
TOTAL $620k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,949k 1,437k
MMBtu
$5.46
- Electrical $3,466k 68,673k
kWh
$0.051
- Natural Gas $4,218k 733k
MMBtu
$4.47

20

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $114k 22k
MMBtu
1.5%
- Electrical $85k 2,151k
kWh
3.1%
- Natural Gas $20k -
MMBtu
-
Waste -
Productivity/Other $1.6k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall