ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Pottery, ceramics, and plumbing fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,658k 247k
MMBtu
$8.78
- Electrical $562k 8,879k
kWh
$0.079
- Natural Gas $786k 129k
MMBtu
$7.38

228

Recommendations

9.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $202k 9.1k
MMBtu
3.7%
- Electrical $59k 885k
kWh
10.0%
- Natural Gas $78k -
MMBtu
-
Waste $3.4k
Productivity/Other $19k
TOTAL $224k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,709k 257k
MMBtu
$8.22
- Electrical $579k 9,222k
kWh
$0.073
- Natural Gas $808k 134k
MMBtu
$6.87

100

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 3.4k
MMBtu
1.3%
- Electrical $23k 334k
kWh
3.6%
- Natural Gas $8.8k -
MMBtu
-
Waste $0.4k
Productivity/Other ($-0.1)k
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall