ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

65

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $771k 102k
MMBtu
$9.18
- Electrical $495k 7,441k
kWh
$0.076
- Natural Gas $121k 25k
MMBtu
$8.01

550

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $137k 15k
MMBtu
14.5%
- Electrical $115k 1,442k
kWh
19.4%
- Natural Gas $2.4k -
MMBtu
-
Waste $12k
Productivity/Other $55k
TOTAL $204k
*May be negative reflecting an increased cost component required to save energy and costs overall

60

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $780k 105k
MMBtu
$9.14
- Electrical $492k 7,629k
kWh
$0.074
- Natural Gas $124k 26k
MMBtu
$8.04

241

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 6.3k
MMBtu
6.0%
- Electrical $45k 609k
kWh
8.0%
- Natural Gas $9.2k -
MMBtu
-
Waste $3.8k
Productivity/Other $12k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall