ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

62

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $766k 103k
MMBtu
$9.13
- Electrical $484k 7,452k
kWh
$0.076
- Natural Gas $123k 26k
MMBtu
$7.93

528

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $131k 14k
MMBtu
13.9%
- Electrical $108k 1,393k
kWh
18.7%
- Natural Gas $2.4k -
MMBtu
-
Waste $12k
Productivity/Other $36k
TOTAL $179k
*May be negative reflecting an increased cost component required to save energy and costs overall

58

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $786k 107k
MMBtu
$8.61
- Electrical $499k 7,767k
kWh
$0.071
- Natural Gas $128k 27k
MMBtu
$7.93

241

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 6.5k
MMBtu
6.1%
- Electrical $46k 630k
kWh
8.1%
- Natural Gas $9.5k -
MMBtu
-
Waste $3.9k
Productivity/Other $13k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall