ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Rubber product manufacturing for mechanical use
SIC 2+ Digits Required
3+ Characters Required for Products

44

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $918k 136k
MMBtu
$8.32
- Electrical $524k 9,539k
kWh
$0.067
- Natural Gas $195k 38k
MMBtu
$6.28

422

Recommendations

9.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 7.6k
MMBtu
5.6%
- Electrical $52k 742k
kWh
7.8%
- Natural Gas $36k -
MMBtu
-
Waste $6.7k
Productivity/Other $30k
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $925k 142k
MMBtu
$8.01
- Electrical $520k 9,835k
kWh
$0.066
- Natural Gas $210k 42k
MMBtu
$6.37

168

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 2.2k
MMBtu
1.6%
- Electrical $14k 217k
kWh
2.2%
- Natural Gas $14k -
MMBtu
-
Waste $2.8k
Productivity/Other $16k
TOTAL $57k