ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

108

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $822k 115k
MMBtu
$8.84
- Electrical $496k 8,225k
kWh
$0.072
- Natural Gas $151k 31k
MMBtu
$7.28

968

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $122k 12k
MMBtu
10.1%
- Electrical $85k 1,128k
kWh
13.7%
- Natural Gas $16k -
MMBtu
-
Waste $10k
Productivity/Other $35k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

100

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $830k 119k
MMBtu
$8.50
- Electrical $498k 8,422k
kWh
$0.069
- Natural Gas $159k 32k
MMBtu
$7.42

432

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 4.9k
MMBtu
4.1%
- Electrical $34k 475k
kWh
5.6%
- Natural Gas $11k -
MMBtu
-
Waste $3.7k
Productivity/Other $16k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall