ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Tire retreading
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $366k 40k
MMBtu
$8.83
- Electrical $194k 2,656k
kWh
$0.083
- Natural Gas $96k 13k
MMBtu
$10.22

31

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 5.8k
MMBtu
14.2%
- Electrical $46k 562k
kWh
21.1%
- Natural Gas $8.5k -
MMBtu
-
Waste -
Productivity/Other $38k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $366k 40k
MMBtu
$8.83
- Electrical $194k 2,656k
kWh
$0.083
- Natural Gas $96k 13k
MMBtu
$10.22

16

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.1k
MMBtu
5.2%
- Electrical $17k 206k
kWh
7.8%
- Natural Gas $4.8k -
MMBtu
-
Waste -
Productivity/Other $38k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall