ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Tire manufacturing (except retreading)
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,614k 821k
MMBtu
$6.57
- Electrical $2,300k 58,018k
kWh
$0.050
- Natural Gas $1,371k 226k
MMBtu
$4.82

165

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $859k 141k
MMBtu
17.2%
- Electrical $508k 13,777k
kWh
23.7%
- Natural Gas $27k -
MMBtu
-
Waste $1.4k
Productivity/Other ($-233.3)k
TOTAL $627k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,936k 882k
MMBtu
$6.57
- Electrical $2,465k 62,741k
kWh
$0.048
- Natural Gas $1,462k 239k
MMBtu
$4.86

56

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 9.2k
MMBtu
1.0%
- Electrical $35k 896k
kWh
1.4%
- Natural Gas $42k -
MMBtu
-
Waste -
Productivity/Other $3.5k
TOTAL $98k
*May be negative reflecting an increased cost component required to save energy and costs overall