ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Tire manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,934k 696k
MMBtu
$6.93
- Electrical $1,963k 49,160k
kWh
$0.055
- Natural Gas $1,167k 192k
MMBtu
$5.68

196

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $732k 120k
MMBtu
17.2%
- Electrical $434k 11,662k
kWh
23.7%
- Natural Gas $24k -
MMBtu
-
Waste $1.2k
Productivity/Other ($-190.0)k
TOTAL $543k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,304k 767k
MMBtu
$6.79
- Electrical $2,146k 54,438k
kWh
$0.053
- Natural Gas $1,280k 209k
MMBtu
$5.20

68

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 8.3k
MMBtu
1.1%
- Electrical $33k 808k
kWh
1.5%
- Natural Gas $37k -
MMBtu
-
Waste -
Productivity/Other $9.8k
TOTAL $96k
*May be negative reflecting an increased cost component required to save energy and costs overall