ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

177

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,278k 203k
MMBtu
$8.50
- Electrical $696k 14,044k
kWh
$0.070
- Natural Gas $318k 58k
MMBtu
$7.03

1,520

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $208k 26k
MMBtu
13.0%
- Electrical $132k 2,580k
kWh
18.4%
- Natural Gas $19k -
MMBtu
-
Waste $6.6k
Productivity/Other ($-4.3)k
TOTAL $210k
*May be negative reflecting an increased cost component required to save energy and costs overall

164

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,328k 214k
MMBtu
$8.28
- Electrical $717k 14,775k
kWh
$0.068
- Natural Gas $337k 62k
MMBtu
$6.99

644

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 4.8k
MMBtu
2.2%
- Electrical $29k 467k
kWh
3.2%
- Natural Gas $14k -
MMBtu
-
Waste $2.7k
Productivity/Other $15k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall