The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 3262 Rubber product manufacturing

165

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,322k 213k
MMBtu
$8.28
- Electrical $715k 14,693k
kWh
$0.069
- Natural Gas $337k 62k
MMBtu
$6.96

1,431

Recommendations

8.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $210k 27k
MMBtu
12.8%
- Electrical $131k 2,661k
kWh
18.1%
- Natural Gas $19k -
MMBtu
-
Waste $6.5k
Productivity/Other ($-15.8)k
TOTAL $201k
*May be negative reflecting an increased cost component required to save energy and costs overall

149

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,378k 227k
MMBtu
$7.84
- Electrical $742k 15,583k
kWh
$0.066
- Natural Gas $359k 66k
MMBtu
$6.89

580

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.0k
MMBtu
2.2%
- Electrical $30k 486k
kWh
3.1%
- Natural Gas $14k -
MMBtu
-
Waste $2.5k
Productivity/Other $11k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall