ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,039k 190k
MMBtu
$6.65
- Electrical $647k 14,015k
kWh
$0.051
- Natural Gas $189k 46k
MMBtu
$6.35

193

Recommendations

9.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 13k
MMBtu
6.6%
- Electrical $66k 1,229k
kWh
8.8%
- Natural Gas $44k -
MMBtu
-
Waste $0.1k
Productivity/Other $27k
TOTAL $156k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,039k 190k
MMBtu
$6.65
- Electrical $647k 14,015k
kWh
$0.051
- Natural Gas $189k 46k
MMBtu
$6.35

74

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 6.6k
MMBtu
3.5%
- Electrical $35k 645k
kWh
4.6%
- Natural Gas $9.7k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall