ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Plastics plumbing fixture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $528k 63k
MMBtu
$9.38
- Electrical $208k 3,951k
kWh
$0.061
- Natural Gas $159k 20k
MMBtu
$7.58

124

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 3.1k
MMBtu
4.8%
- Electrical $19k 299k
kWh
7.6%
- Natural Gas $32k -
MMBtu
-
Waste $4.9k
Productivity/Other $53k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $528k 63k
MMBtu
$9.38
- Electrical $208k 3,951k
kWh
$0.061
- Natural Gas $159k 20k
MMBtu
$7.58

52

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 0.9k
MMBtu
1.4%
- Electrical $5.4k 88k
kWh
2.2%
- Natural Gas $8.4k -
MMBtu
-
Waste -
Productivity/Other $34k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall