ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

519

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $872k 118k
MMBtu
$8.86
- Electrical $589k 10,113k
kWh
$0.067
- Natural Gas $84k 14k
MMBtu
$6.82

4,203

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 13k
MMBtu
11.3%
- Electrical $83k 1,297k
kWh
12.8%
- Natural Gas $3.6k -
MMBtu
-
Waste $2.1k
Productivity/Other $33k
TOTAL $145k
*May be negative reflecting an increased cost component required to save energy and costs overall

480

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $863k 118k
MMBtu
$8.81
- Electrical $579k 10,053k
kWh
$0.067
- Natural Gas $88k 14k
MMBtu
$6.82

1,803

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.8k
MMBtu
4.1%
- Electrical $28k 468k
kWh
4.7%
- Natural Gas $3.7k -
MMBtu
-
Waste $1.1k
Productivity/Other $16k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall