ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

504

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $861k 117k
MMBtu
$8.83
- Electrical $580k 10,037k
kWh
$0.067
- Natural Gas $85k 14k
MMBtu
$6.82

4,083

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 13k
MMBtu
11.3%
- Electrical $82k 1,294k
kWh
12.9%
- Natural Gas $3.3k -
MMBtu
-
Waste $2.2k
Productivity/Other $34k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall

469

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $847k 116k
MMBtu
$8.80
- Electrical $562k 9,872k
kWh
$0.067
- Natural Gas $89k 14k
MMBtu
$6.76

1,776

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.8k
MMBtu
4.2%
- Electrical $29k 470k
kWh
4.8%
- Natural Gas $3.8k -
MMBtu
-
Waste $1.1k
Productivity/Other $15k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall