ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

487

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $841k 115k
MMBtu
$8.81
- Electrical $561k 9,810k
kWh
$0.067
- Natural Gas $86k 14k
MMBtu
$6.81

3,961

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 13k
MMBtu
11.6%
- Electrical $83k 1,303k
kWh
13.3%
- Natural Gas $3.4k -
MMBtu
-
Waste $2.2k
Productivity/Other $34k
TOTAL $145k
*May be negative reflecting an increased cost component required to save energy and costs overall

442

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $847k 117k
MMBtu
$8.61
- Electrical $562k 9,987k
kWh
$0.066
- Natural Gas $92k 15k
MMBtu
$6.80

1,677

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 4.8k
MMBtu
4.1%
- Electrical $28k 467k
kWh
4.7%
- Natural Gas $3.9k -
MMBtu
-
Waste $1.2k
Productivity/Other $15k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall