ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Plastics bottle manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

63

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,414k 199k
MMBtu
$7.30
- Electrical $1,006k 18,793k
kWh
$0.054
- Natural Gas $38k 6.6k
MMBtu
$6.47

502

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $153k 21k
MMBtu
10.6%
- Electrical $111k 2,060k
kWh
11.0%
- Natural Gas ($-14.2)k -
MMBtu
-
Waste $19k
Productivity/Other $22k
TOTAL $193k
*May be negative reflecting an increased cost component required to save energy and costs overall

57

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,295k 193k
MMBtu
$7.03
- Electrical $929k 18,207k
kWh
$0.053
- Natural Gas $35k 6.4k
MMBtu
$5.99

227

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 7.3k
MMBtu
3.8%
- Electrical $38k 715k
kWh
3.9%
- Natural Gas $0.9k -
MMBtu
-
Waste $20k
Productivity/Other $1.0k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall