ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Urethane and other foam product (except polystyrene) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

32

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $549k 56k
MMBtu
$10.06
- Electrical $328k 4,316k
kWh
$0.075
- Natural Gas $84k 12k
MMBtu
$7.01

246

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 7.2k
MMBtu
12.8%
- Electrical $53k 701k
kWh
16.2%
- Natural Gas $14k -
MMBtu
-
Waste $1.0k
Productivity/Other $25k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $527k 58k
MMBtu
$9.28
- Electrical $330k 4,537k
kWh
$0.071
- Natural Gas $84k 12k
MMBtu
$6.81

99

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.9k
MMBtu
6.7%
- Electrical $26k 383k
kWh
8.4%
- Natural Gas $2.9k -
MMBtu
-
Waste -
Productivity/Other $1.0k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall