ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Urethane and other foam product (except polystyrene) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $513k 57k
MMBtu
$9.26
- Electrical $321k 4,420k
kWh
$0.071
- Natural Gas $82k 11k
MMBtu
$6.89

223

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 7.0k
MMBtu
12.4%
- Electrical $48k 685k
kWh
15.5%
- Natural Gas $14k -
MMBtu
-
Waste $1.1k
Productivity/Other $28k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $521k 56k
MMBtu
$9.41
- Electrical $324k 4,496k
kWh
$0.070
- Natural Gas $86k 9.9k
MMBtu
$7.04

95

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.0k
MMBtu
7.2%
- Electrical $27k 393k
kWh
8.7%
- Natural Gas $3.1k -
MMBtu
-
Waste -
Productivity/Other $1.1k
TOTAL $42k