ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Polystyrene foam product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,067k 177k
MMBtu
$7.26
- Electrical $709k 15,010k
kWh
$0.060
- Natural Gas $152k 23k
MMBtu
$6.30

238

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 6.7k
MMBtu
3.8%
- Electrical $35k 653k
kWh
4.3%
- Natural Gas $11k -
MMBtu
-
Waste $0.4k
Productivity/Other $84k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,117k 183k
MMBtu
$7.41
- Electrical $750k 15,642k
kWh
$0.062
- Natural Gas $153k 23k
MMBtu
$6.09

111

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 3.3k
MMBtu
1.8%
- Electrical $15k 319k
kWh
2.0%
- Natural Gas $4.1k -
MMBtu
-
Waste -
Productivity/Other $25k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall