The ITAC Statistics page displays the average assessment results for the selected criteria.
109
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $842k | 130k |
MMBtu
|
$8.55 |
- Electrical | $574k | 11,879k |
kWh
|
$0.068 |
- Natural Gas | $50k | 8.3k |
MMBtu
|
$5.40 |
945
Recommendations
8.7
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $112k | 13k |
MMBtu
|
10.1% |
- Electrical | $81k | 1,282k |
kWh
|
10.8% |
- Natural Gas | $9.7k | - |
MMBtu
|
- |
Waste | $2.7k | |||
Productivity/Other | $28k | |||
TOTAL | $143k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
104
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $865k | 135k |
MMBtu
|
$8.40 |
- Electrical | $589k | 12,345k |
kWh
|
$0.066 |
- Natural Gas | $50k | 8.3k |
MMBtu
|
$5.27 |
383
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $33k | 5.0k |
MMBtu
|
3.7% |
- Electrical | $24k | 484k |
kWh
|
3.9% |
- Natural Gas | $2.1k | - |
MMBtu
|
- |
Waste | $0.4k | |||
Productivity/Other | $13k | |||
TOTAL | $46k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |