Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Plastics bag and pouch manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

39

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $966k 142k
MMBtu
$8.05
- Electrical $641k 12,962k
kWh
$0.060
- Natural Gas $50k 7.9k
MMBtu
$4.63

330

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 10k
MMBtu
7.3%
- Electrical $54k 1,016k
kWh
7.8%
- Natural Gas $7.0k -
MMBtu
-
Waste $0.3k
Productivity/Other $36k
TOTAL $115k
*May be negative reflecting an increased cost component required to save energy and costs overall

38

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $966k 143k
MMBtu
$8.02
- Electrical $641k 13,048k
kWh
$0.060
- Natural Gas $50k 7.9k
MMBtu
$4.52

155

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 4.9k
MMBtu
3.4%
- Electrical $26k 473k
kWh
3.6%
- Natural Gas $2.0k -
MMBtu
-
Waste $0.1k
Productivity/Other $9.6k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall